On the left side of the bay of Lefkes, we can see the half-destroyed loading bridge that was used to load the iron ore from nearby mines onto ships. Just before the bridge, there is an entrance to the mining galleries.
Construction // Traditional Construction
Iron Ore Unloading Bridge
Attributes
Altitude (in meters) | : | 10 |
Time Reference | : | 1900 |
Access | : | Path |
Accessible | : | Moderate |
Duration of Visit | : | 30 minutes |
More
Similar: Constructions
Threshing Floor by the Ancient Aqueduct
(Traditional Construction)
KIKLADES, KITHNOS, Municipal Division(Traditional Construction)
Well on the Way to the Church of Saint Paraskevi
(Traditional Construction)
KIKLADES, KITHNOS, Municipal Division(Traditional Construction)
Threshing Floor by the Church of the Savior
(Traditional Construction)
KIKLADES, KITHNOS, Municipal Division(Traditional Construction)
Threshing Floor by the Church of Saint Paraskevi
(Traditional Construction)
KIKLADES, KITHNOS, Municipal Division(Traditional Construction)
DISTANCES