EG Mobile

Info
Map Position    Cluster      Map Kind:
show map
ConstructionSchoolConstruction // School

High School

Lipsi does not share the country's problem with a low birth rate. Of the 784 inhabitants of the island, 200 are children. This is very encouraging, but it also creates obligations for the state to support the island's infrastructure with elementary and high school teachers. Both the elementary school and junior and senior high school of Lipsi are housed in beautiful facilities with open spaces and sports fields surrounded by the magnificent Aegean landscape. The junior and senior high school building was constructed in 2000. It has modern facilities for its 55 students: a library, a theater, a computer room, a medical office, a basketball court, a volleyball court, and a soccer field. There is a kindergarten in the same building. More than half of the schoolyard contains grass or flowers.

Rating

EG Editors:
Υοur Rating:
Users' Rating:
Popularity: 450

Attributes

Altitude (in meters) : 20
Time Reference : 2000
Access : RoadRoad
Accessible : NormallyNormally
Duration of Visit : 20 minutes

 Less
 More

Similar: Constructions

Dodecanese - Lipsi
Municipality
Lipsi (191)
(Municipality)
DODEKANISSA, LIPSI, Municipal Division
Dodecanese - Lipsi - Neoclassical House
Traditional Construction
House with Neoclassical Architecture
(Traditional Construction)
DODEKANISSA, LIPSI, Municipal Division
Dodecanese - Lipsi - Windmill
Windmill Watermill
Mill of Aravi
(Windmill Watermill)
DODEKANISSA, LIPSI, Municipal Division
Dodecanese - Lipsi - Traditional Well
Traditional Construction
Traditional Well
(Traditional Construction)
DODEKANISSA, LIPSI, Municipal Division
Dodecanese - Lipsi - Shipyard
Traditional Construction
Boatyard
(Traditional Construction)
DODEKANISSA, LIPSI, Municipal Division

DISTANCES










My Trip
0.3825 19.85MB