Traditional metal bridge for the rack railway shortly after the “Courts” (“Dikastiria”) when descending toward Niamata. There is also an informative sign about the Chelmos - Vouraikos National Park here. Construction began in 1889 (as directed by Prime Minister Charilaos Trikoupis and was completed in 1896. It was one of the most difficult, complex technical projects of its time (and even by today's standards). The research and construction were carried out by French engineers and contractors. The toothed portion of the route covers a total of 3,400 meters. From 2003 to 2009, there was a large-scale renovation of the tracks and trains.
Construction // Bridge
Rack Railway Bridge
Attributes
Altitude (in meters) | : | 290 |
Access | : | Path |
Accessible | : | Moderate |
Duration of Visit | : | 1 hour 30 minutes |
More