The construction of the dam (fragma) was completed in 2005; it was intended to provide the irrigation and water supply for the island. Although the reservoir is full, the dam is not used because there is no infrastructure for the treatment and transportation of the water.
Construction // Dam
Dam
Attributes
Altitude (in meters) | : | 62 |
Chronological Period | : | Third Hellenic Republic |
Access | : | Road |
Accessible | : | Normally |
Cost Category | : | Free |
Duration of Visit | : | 25 minutes |
More
Similar: Constructions
DISTANCES